How to Compare Siding Estimates With Very Different Totals
Three companies walked your house. Three numbers came back. The spread between highest and lowest is wide, and nothing in the documents explains where it went.
That gap is usually not a pricing difference. It is a scope difference. An estimate is a written description of work, and the price is what that description costs. One document can include a full tear-off, a new water-resistive barrier, kick-out flashing at every roof-wall intersection and a dumpster. Another leaves all four unsaid. Compare the documents, not the totals.
What a complete estimate contains
A complete estimate names things. An incomplete one describes an outcome. You should be able to put a finger on a line for each of these:
- Product by manufacturer and line, not “premium siding.” HardiePlank lap at a stated exposure, ColorPlus or primed. For vinyl, brand, profile and panel.
- Square footage, and how it was measured.
- Trim: material, width and location. Corners, casing, rakes, frieze.
- Soffit and fascia, or a statement that they stay.
- The water-resistive barrier, by name.
- Flashing, by type and location.
- Tear-off scope, and where the debris goes.
- Permit, disposal and site protection.
- Approximate start and completion dates.
- Total price, deposit and payment schedule.
- The workmanship warranty term, separate from the manufacturer warranty.
- The Pennsylvania registration number.
A missing line is rarely free work. It means nobody has decided yet, and undecided resolves one of two ways later: a change order you pay for, or a shortcut you never discover.
The barrier behind the siding is not the siding
Siding is cladding. It sheds most of the water most of the time. What keeps water out of the wall is the water-resistive barrier behind it, and both manufacturers say so.
James Hardie’s instructions call for a water-resistive barrier, installed with penetration and junction flashing, then state flatly that James Hardie will assume no responsibility for water infiltration. The Vinyl Siding Institute is just as direct: vinyl siding, insulated vinyl siding and polypropylene siding are exterior claddings, not water-resistive barriers, and must be installed over one.
So look for the barrier by name. Not “house wrap.” The product. If the estimate is silent, ask whether it is a new barrier or the one already on the wall, cut open by every window replacement since. Tyvek HomeWrap may be left exposed 120 days, so the crew has a real window between tear-off and siding, and it is vapor-open at 56 perms, which is why the wall behind it can dry. More in choosing siding materials.
Flashing and trim, checked from the driveway
Flashing is where two bids that read alike stop being alike. It is also the part you can verify without a ladder. Every ZIP code in Pennsylvania sits in James Hardie’s HZ5 zone, and James Hardie publishes HZ5 clearances in inches:
- Siding to ground: minimum 6 in.
- Siding to slabs, paths and steps: minimum 2 in.
- Siding to deck: minimum 2 in, with Z-flashing.
- Roof to wall: minimum 2 in.
- Siding to gutter: 1 in.
- Sheltered areas: minimum 1/4 in.
- Mortar and masonry: minimum 1/4 in, with L-flashing and Z-flashing.
James Hardie requires kick-out flashing at a minimum of 4 in by 4 in. It throws roof runoff into the gutter instead of behind the siding. From the driveway of a house in Mechanicsburg or Lititz, count the places a roof edge dies into a wall. Each one needs a kickout. Then see whether the word appears in your estimates.
James Hardie also requires flashing gaps left open, not sealed. Horizontal Z-flashing carries a minimum 1/4 in gap with an explicit instruction not to caulk, and the same holds at block penetrations and field-joint flashing. Caulking a gap meant to drain traps the water the flashing was installed to release.
Trim diverges the same quiet way. Material, width and location are the specification; “trim included” is not. Wrapping existing trim in coil is different work from replacing it.
None of this is only a leak question. Improper installation is an explicit exclusion in James Hardie’s warranties, and the instructions say in capitals that failure to install and finish per applicable building codes and James Hardie written application instructions may void the product-only warranty. The 30-year substrate warranty pays no labor at all, as we set out in the ColorPlus warranty breakdown, so the installer carries more of your risk than the manufacturer does.
Fastening, the spec that rarely reaches paper
Almost no estimate will contain a fastening schedule. Ask anyway. The answer tells you who is across the table.
For HardiePlank, blind nailing is the preferred method. Where no nail line is present, fasteners go between 3/4 in and 1 in from the top of the plank, no closer than 3/8 in from the edge, with a minimum 1-1/4 in overlap so the course above covers them. James Hardie limits face nailing to high wind areas and says never to combine it with blind nailing. For fastener selection and design wind loads James Hardie points to ICC-ES reports ESR-1844 and ESR-2290. A contractor who can name the report behind their fasteners has read it.
For vinyl the failure runs the other way, because vinyl moves. Leave about 1/32 in between fastener head and panel, the thickness of a dime. Center fasteners in the slots. Do not force panels up tight. Maximum 16 in spacing on horizontal panels, screws no less than 1-1/4 in into framing or furring. Tight nailing buckles the wall with temperature, and that shows up on the first hot afternoon after the crew leaves.
Two more questions for the contractor. Where material sits between delivery and installation: James Hardie says store flat, dry and covered, and saturated planks shrink and open butt joints. And how butt joints are treated: James Hardie recommends joint flashing, and caulking is specifically not recommended on ColorPlus for aesthetic reasons. Cold-weather installation covers which temperature rules are real.
Tear-off, and everything that follows from it
This is the largest legitimate reason two honest bids land far apart.
For vinyl, the VSI manual expressly contemplates re-siding over existing siding, with conditions. Nail down loose boards. Replace rotten ones. Never install over rotting wood. Scrape and re-caulk around openings, remove protrusions, and check walls for evenness, adding furring strips for a smooth continuous surface. Done that way it is a real option and a real saving.
For fiber cement, we will be straight about what we can document. James Hardie’s instructions name the substrates the product accepts: braced wood or steel studs at 24 in on center maximum, or directly to minimum 7/16 in OSB sheathing, on flat vertical walls only. Technical Bulletin 19, dated February 2025, covers non-nailable substrates and defines those as continuous insulation and exterior gypsum. It does not address existing siding. We will not tell you the manufacturer permits or prohibits it, because we could not confirm either from a primary source. We can tell you that irregularities in framing and sheathing mirror through the finished wall, and that our scope includes tear-off.
Tear-off also buys the one thing nobody can price in advance: a look at the sheathing. The estimate should carry a unit price per sheet, because a contractor who promises none will be needed is guessing at a wall they have not opened.
What follows belongs on the page too. Dumpster and haul-away. The permit, and who pulls it. Protection for landscaping, the condenser, and a magnet sweep before the crew leaves. We handle the permits. The walkthrough has the rest.
Allowances and exclusions are change orders you have not met yet
An allowance is a placeholder amount for something not yet chosen. An exclusion is named work that is not in the price. Both are legitimate. Both are how a low bid becomes a middle bid after work starts.
Turn every allowance into a question whose answer contains a number. Ask the per-foot price if the trim runs past its allowance. And read the exclusions, because an estimate with no exclusions section is not an estimate without exclusions.
Registration and insurance, verified
Every estimate should carry the contractor’s Pennsylvania Home Improvement Contractor registration number. Ours is PA203681. A registration number tells you who you are hiring. It does not tell you whether they can flash a roof-wall intersection.
For insurance, ask each contractor for a certificate of insurance issued by the carrier, current at signing and while the work is performed. We are fully insured.
The cheapest bid is sometimes the right one
Expensive is not a proxy for careful. A high bid can carry no flashing detail at all, while a low bid names the barrier, states the tear-off scope and publishes a per-sheet sheathing price. The document is the proxy, not the number.
Build a one-page grid, one column per bid. Rows for product and line, square footage, barrier by name, kick-out flashing, tear-off, sheathing unit price, permit, deposit, dates, warranty term and registration number. Fill every cell from the document, not from what you remember the salesperson saying. Then call about the blanks and ask all three to re-quote the same scope. The numbers move toward each other, and when they stop you are comparing like with like. If the lowest bid is still lowest and its document is complete, buy it. If you want one more set of numbers for the grid, our estimates are free, detailed and no-pressure.
Two last notes. A workmanship guarantee is separate from anything the manufacturer offers; ours is a 10-year workmanship guarantee from Fortress. And if the numbers came in higher than you planned, waiting is allowed. Good crews book ahead seasonally, so a decision made in a rush to hold a slot is still made in a rush. If you are weighing whether the whole wall needs to come off, repair versus full replacement settles that first, and scheduling is worth reading before it applies pressure.
Fortress Siding & Roofing installs James Hardie fiber cement and premium vinyl siding, and also handles roofing, replacement windows, seamless gutters, fascia and soffit, throughout Lancaster, York, Cumberland, Dauphin, Lebanon, Berks, Chester, Bucks, Montgomery and Delaware counties. PA HIC #PA203681. James Hardie specialist. We install CertainTeed shingles and offer a 10-year workmanship guarantee from Fortress.
Call Before You Are Ready
If your project is a season or more out, this is the right time to call. It costs nothing to get measured, get a written scope, and find out honestly where you land on the calendar.