What to Expect on Roof Replacement Day, Start to Finish

A roof replacement in Lancaster County or York County, PA takes one to two days for most homes, weather permitting. The day runs in a set order: tear-off to the deck, deck inspection, underlayment and flashing, shingles, then cleanup with a magnet sweep for nails. Before the crew arrives, park on the street, take pictures off the walls, cover what you store in the attic and keep pets indoors.

PA HIC #PA203681Fully insuredFree, detailed estimatesWe handle the permits

What happens on roof replacement day, in order?

On roof replacement day the crew removes the old roof down to the deck, inspects the deck, installs underlayment and flashing, installs the shingles and cleans up, in that order. A roof replacement takes one to two days for most homes, weather permitting. At Fortress Siding & Roofing we run that whole sequence, so you are not coordinating a dumpster, a crew and a disposal run.

Clock times differ from job to job, and a larger roof spreads the same steps over two days. Read the table below as the order of events, and ask your contractor what time the crew will arrive.

A typical roof replacement day with a careful crew, from the evening before to the last nail sweep
Time of dayWhat is happeningWhat you should do
The evening before the jobA dumpster and the new materials may already be on site. Owens Corning notes that a dumpster can arrive one to two days early, and materials a few days early or that same morning.Park on the street. Clear the driveway and the ground around the house, and remove pictures and mirrors from the walls.
Crew arrivalThe crew sets ladders, stages materials and lays ground tarps to catch debris.Walk the property with the crew lead. Point out fragile plants, locked gates and a working outdoor outlet. Bring pets indoors.
MorningThe old shingles and underlayment come off, down to the deck. Owens Corning calls this the messiest part of the process.Keep people and pets away from the ground below the roof edges, where old shingles and nails land.
Late morningWith the roof open, the decking is checked for rot and soft spots, and bad sections are replaced.Stay reachable. Ask for photos of any decking that needs replacing before new material covers it.
Midday and afternoonUnderlayment and flashing are installed, then the shingles, from the eaves toward the ridge.Expect steady nailing overhead. Nothing is needed from you during this stretch.
Late afternoonHip and ridge shingles finish the roof. The crew cleans up, hauls the debris and sweeps for nails with a magnet.Walk the yard and driveway with the crew lead before anyone leaves.
A second day, when one is neededA roof replacement takes one to two days for most homes, and a larger or more complex roof, or one with rotten decking, can run longer. A careful crew closes the roof against rain before leaving for the night.Ask how the roof will be covered overnight. Keep vehicles on the street until the final sweep is done.

How should you prepare your home before the crew arrives?

Prepare by clearing the driveway and the ground around the house, protecting what sits under the roof and telling your neighbors. Most of it can be done the evening before the job. The list below draws on homeowner guidance from two shingle manufacturers, IKO and Owens Corning.

  • Park on the street the evening before the job. IKO warns that a car left in the driveway until morning can be trapped by a material delivery, and the crew needs the driveway all day.
  • Clear the ground around the house. Move patio furniture, toys, potted plants and garden ornaments. IKO suggests 15 feet of clearance on every side.
  • Mark or cover your most valued plants. Show the crew lead which beds and shrubs need extra room.
  • Mow the lawn. Stray nails are much easier to find in short grass.
  • Unlock the gates. The crew has to reach every side of the house.
  • Check an outdoor outlet. The crew may need power, so make sure one outlet works.
  • Clear the walls. Mirrors, pictures and loose shelves can shake loose, and IKO says to be most thorough on the top floor.
  • Tell the neighbors. Owens Corning suggests a few days of notice. A neighbor who shares your driveway will need street parking as well.

If a satellite dish or solar panels sit on the roof, raise that at the estimate. Who removes and resets them belongs in the written scope.

How loud is a roof replacement, and can you stay home?

A roof replacement is loud for most of the working day, and you can still stay home if you choose. Owens Corning says homeowners can plan to be home in most cases, though the work can be very noisy and disruptive for anyone working from home. IKO adds that nailing shingles vibrates the whole building, with no long-term damage.

If you take calls from home, have a napping child or simply dislike hammering overhead, plan to spend the day somewhere else. Leave a phone number with the crew lead, because a decking question may need a quick answer once the old roof is gone.

What should you do about pets, children and vehicles?

Keep pets and small children away from the work for the day, and keep vehicles on the street until the final nail sweep is done. IKO notes that hammering and strangers disturb dogs and cats, and it recommends a friend's house or a kennel for the day. If that is not possible, keep pets indoors, because a pet loose in the yard can step on a stray nail.

Tell the crew about any gate that must stay shut. For children, IKO's advice is a day with family or friends where you can arrange it, and shoes at all times for any child who stays home.

Keep vehicles out of the driveway and out of the garage as well. IKO points out that garage roofs are usually not insulated, so shingle granules and nails can drop through and scratch the paint.

Will dust get into the attic or the garage?

Yes, expect some dust and shingle grit in the attic, and in an uninsulated garage if its roof is part of the job. IKO says the attic collects the most dust during a roof replacement. Lay tarps or painter's drop sheets over the attic floor and anything stored there, and carry fragile or sentimental items downstairs first.

You may also notice nail points on the underside of the deck when the job is done. On thinner decks that is by design. CertainTeed's applicator manual for its Landmark series of shingles says nails must go at least 3/4 inch into a deck that is 3/4 inch thick or more, and at least 1/8 inch through a thinner one.

Want a straight answer on your home?

We will look at the house, tell you what it needs, and give you a detailed estimate. It is free and there is no pressure.

What does the crew check once the old shingles are gone?

Once the old shingles are gone, the crew checks the decking, the wood surface that holds the shingle nails, for rot and soft spots. This is the one part of the job nobody can judge from the driveway, and it is one reason we do not roof over old shingles. We tear off to the deck, inspect what is there, replace anything soft and start clean.

The deck also has to meet the shingle maker's minimum. CertainTeed's manual for its Landmark series calls for at least 3/8-inch plywood, 7/16-inch non-veneer panel or nominal 1-inch wood decking.

Flashing is checked at the same stage. Owens Corning notes that flashing around vents, chimneys and valleys may need replacing. CertainTeed's manual requires corrosion-resistant flashing wherever a roof meets a wall, another roof, a chimney or anything else that penetrates the roof.

Three questions are worth settling before the day, with us or with any other contractor:

  • How is replacement decking priced, and is that price written in the estimate?
  • Who calls you before extra decking work begins?
  • Will you get photos of what was found and what was replaced?

Replacing decking can add time. When it does on one of our jobs, we tell you instead of quietly extending the work.

What if it rains or the job runs into a second day?

If rain is coming or the job runs into a second day, the roof should be closed against water before the crew leaves. Ask who watches the forecast, how much roof is opened at one time and how any open section is covered overnight.

Cool weather raises one more question. CertainTeed's manual says shingle sealing may be delayed when shingles are applied in cool weather, and that hand sealing may be necessary if they have not sealed after a reasonable time. If your roof is installed late in the season, ask how the crew will handle that.

What should the final walkthrough cover?

The final walkthrough should cover the roof, the ground around the house and the paperwork. Owens Corning describes it as the point where you make sure the contractor has done everything that was promised. Do it in daylight, before the crew leaves, and ask for one if nobody offers.

  • The roof, seen from the ground. Look for straight shingle lines and for cap shingles along every ridge and hip.
  • Flashing. Ask for photos of the flashing at walls, chimneys and vents if you cannot see it yourself.
  • Lawn, beds and driveway. Look for nails, scuffed grass and marks on the driveway, and tell the crew lead that same day. If you find nails, ask for a second sweep.
  • Attic and garage. Fold the drop sheets carefully and check that nothing was shaken loose.
  • Paperwork. Confirm who registers the manufacturer warranty, if registration applies, and keep your signed contract.

On our jobs, cleanup means a magnet sweep for nails, the debris hauled and the driveway left the way we found it. Our roofs carry the 10-year workmanship guarantee from Fortress. The CertainTeed manufacturer warranty on the shingles is separate and comes from CertainTeed.

If something looks wrong a day or a week later, tell your contractor. IKO notes that changing weather can knock a shingle loose before it seals, and that a professional roofer should be eager to fix an honest mistake.

Where do you start if your roof is due for replacement?

Start with a free roof inspection, because a roof priced without a count of its layers is a guess. You can book a roof inspection online or call 717-864-6896, and you will reach a local team, not a call center. If your roof has years left, we will tell you that honestly.

Our roof replacement page lays out what the job includes. The price follows the size and shape of the roof, the layers already on it, the shingle you choose and the condition of the decking. After the free inspection you get a detailed estimate with no pressure to decide on the spot.

We are based in Mountville and replace roofs across Lancaster County, York County and eight nearby Pennsylvania counties. For the questions that come up before the day itself, read our roofing FAQs for first-time homeowners.

Common Questions

How long does a roof replacement take?

Most roof replacements take one to two days, weather permitting. A larger or more complex roof can run longer, and so can one where rotten decking turns up once the old shingles are gone. The work follows a set order: tear-off, deck inspection, underlayment and flashing, shingles, then cleanup and disposal.

Do I need to be home during a roof replacement?

No, two shingle makers' homeowner guides treat staying home as optional, but stay reachable by phone. Owens Corning says you can plan to be home in most cases, though the work can be very noisy and disruptive if you work from home. IKO advises anyone who leaves to give the roofers a phone number. Decking problems only show once the old roof is gone, so the crew may need a quick answer from you.

Where should I park during a roof replacement?

Park on the street, a safe distance from the house, starting the evening before the job. IKO, a shingle manufacturer, warns that a car left in the driveway until morning can be trapped by a material delivery. It also advises against parking in the garage, because shingle granules and nails can drop through an uninsulated garage roof and scratch the paint.

Should pets stay home during a roof replacement?

Pets do better away from the house for the day, and indoors if they have to stay. IKO, a shingle manufacturer, notes that hammering and strangers disturb dogs and cats, and that a pet loose in the yard can step on a stray nail. Tell the crew about any gate that must stay shut, and walk dogs before the work starts.

Will a roof replacement leave dust in my attic?

Yes, expect some dust and shingle grit in the attic. IKO, a shingle manufacturer, says the attic collects the most dust during a roof replacement. It suggests laying tarps or painter's drop sheets on the attic floor and moving fragile or sentimental items to the ground floor. Do the same in an uninsulated garage if its roof is being replaced.

What happens if the crew finds rotten decking under the old roof?

Soft or rotten decking is replaced before the new underlayment is installed. Decking cannot be judged from the driveway, which is why we tear off to the deck and inspect it. Replacing decking can add time to the usual one to two days, and we tell you when that happens rather than quietly extending the job.

More answers on our FAQ page.

Get Your Free Estimate

No pressure. No obligation. Just a straight answer on what your project will take and what it'll cost.

Phone 717-864-6896
Hours Monday-Saturday, 7 AM-7 PM. Closed Sunday.
Service Area Based in Mountville, PA
Central & Southeastern Pennsylvania
Lesher Holdings shield logo A Lesher Holdings Company
📞 Call NowFree Estimate